Business Performance About Us

ABOUT US

  • 2024

    • Detailed Design Service for Improvement of Signal Facility between Gomakwonand Mokpo on HonamLine (3nd)
  • 2023

    • Detailed Design for Improvement of Aged Signal Facility (ATP) on GyeongbuLine (between Pyeongtaek and Daejeon) (3nd)
    • Design Service for Improvement of Signal Equipment at Jecheon Station on the Jungang Line (1st)
    • Detailed Design Service for Improvement of Signal Facility between Gomakwonand Mokpo on HonamLine (2nd)
    • Informatization Strategy Plan (ISP) service for the construction of the 2nd Central Train Control Center (3nd)
    • Detailed design for signal facility improvement between Neunggokand Uijeongbuin Gyooelines (3nd)
  • 2022

    • Detailed design for signal facility improvement between Neunggokand Uijeongbuin Gyooelines (2nd)
    • Informatization Strategy Plan (ISP) service for the construction of the 2nd railway control center (2nd)
    • Detailed Design for Improvement of Aged Signal Facility (ATP) on GyeongbuLine (between Pyeongtaek and Daejeon) (2nd)
    • Detailed design service for KTCS-2 signaling facility for Gyeongbuhigh-speed line between Dongdaeguand Singyeongju (1st)
    • Detailed Design Service for Improvement of Signal Facility between Gomakwonand Mokpo on HonamLine (1st)
  • 2021

    • Detailed Design for Safety Vulnerable Areas of GyeongbuHigh-speed Railway (Daejeon-bukdoLine) Section 2 Construction (signal field)
    • Proposal Design for Private Investment Facility Project for Metropolitan Area Express Railway Line C
    • Informatization Strategy Plan (ISP) service for the construction of the 2nd Central Train Control Center (1st)
    • Detailed Design for Improvement of Signal Facility (ATP) in GyeongbuLine (Pyeongtaek ~ Daejeon) (1st)
    • Detailed design for signal facility improvement between Neunggokand Uijeongbuin Gyooelines (1st)
  • 2020

    • Gyeongbuhigh-speed railway safety vulnerable points (Daejeon-bukdoconnection line) T/K bidding (basic) service for the 2nd section construction work (signal field)
    • Pre-feasibility review service for the private investment facility project for the metropolitan area express railway line C (signal field)
    • Honamhigh-speed railway (Gomakwon-Mokpo) Section 4 Construction Technical Proposal Design (signal field interface)
    • Honamhigh-speed railway (Gomakwon-Mokpo) Section 5 Construction Technical Proposal Design (signal field interface)
    • Cost Estimation of System for Construction Project of 2nd Central Train Control Center